[Most Recent Quotes from www.kitco.com]

ORIGINAL: Nord Precious Metals’ Subsidiary, Temiskaming Testing Laboratories, Advancing Towards ISO 17025 Certification

May 1, 2024

2024-05-01 07:31 ET – News Release   (via TheNewswire) Temiskaming Testing Laboratories developing its analytical arm and RND facility May 1, 2024 – TheNewswire – Coquitlam, BC, Nord Precious Metals Mining Inc., (TSXV: NTH) (OTCQB: CCWOF) (Frankfurt: 4T9B) (the “Company” or “Nord” or “Nord Precious Metals”) proudly announces significant strides in the journey of its subsidiary, Temiskaming Testing Laboratories (TTL), towards ISO 17025...

read more

Granada Gold Mine Defines Priority Drill Targets

May 1, 2024

The PichĂ© Structural Complex contact with footwall mineralization is a strategic drilling location near the north end of the Granada Gold Mine Property Note: See previous news releases at https://granadagoldmine.com/en/news/2024/ Rouyn Noranda, Q.C., May 1, 2024 – Granada Gold Mine Inc. (TSXV: GGM) (OTC: GBBFF) (Frankfurt: B6D) (the “Company” or “Granada”) is progressing with its drill program, which aims to resume a 120,000-meter...

read more

Kobo Resources Continues to Intersect High-Grade Gold Mineralisation at its Kossou Gold Project with 19.0 Metres at 2.82 g/t Au…

Apr 30, 2024

QUEBEC CITY, QC – Kobo Resources Inc. (“Kobo” or the “Company“) (TSX.V: KRI) is pleased to announce positive results from the first diamond drill hole of the Company’s 2024 exploration program at its 100% owned Kossou Gold Project (“Kossou”) located in Cote d’Ivoire, West Africa. Highlights: KDD001: 38.20 metres (“m”) at 1.55 g/t* Au from 61.40 m, including 19.10 m at 2.82 g/t* Au from 61.40 m and 3.70 m at 11.82 g/t Au from 67.30...

read more

KER Report: Arizona Gold & Silver – Drilling Started At The Resaca Claim On The Philadelphia Gold-Silver Project, Arizona

Apr 30, 2024

https://www.kereport.com/2024/04/30/arizona-gold-silver-drilling-started-at-the-resaca-claim-on-the-philadelphia-gold-silver-project-arizona/ Cor April 30, 2024 Mike Stark, Chairman, President and CEO of Arizona Gold & Silver (TSX.V:AZS – OTCQB:AZASF) joins me to discuss the RC drill program that started on April 10th on the Company’s Philadelphia Gold-Silver Project, in Arizona. The program is focused at the Resaca Claim, a 400 meter gap in the drilling from past programs. See the...

read more

Golden Cariboo Resources: Multiple Broad Intercepts of Replacement Gold Mineralization Intersected in Drill Hole QGQ23-04

Apr 30, 2024

April 30, 2024 Vancouver, Canada – Golden Cariboo Resources Ltd. (“GCC” or the “Company”) (CSE-GCC, OTC-GCCFF, WKN-A0RLEP) is pleased to announce the receipt of the remaining assay results from QGQ23-04 at its Quesnelle Gold Quartz Mine property (the “Project”) near Hixon, British Columbia. Surface drill hole QGQ23-04, previously referred to as QGQ23-01, was reported as containing several gold (“Au”) intercepts with additional results pending (January 18, 2024 News...

read more

ORIGINAL: P2 Gold Increases Inferred Resources at Gabbs by 69%

Apr 29, 2024

2024-04-29 05:00 ET – News Release   P2 Gold Increases Inferred Resources at Gabbs by 69% Canada NewsWire VANCOUVER, BC, April 29, 2024 VANCOUVER, BC, April 29, 2024 /CNW/ – P2 Gold Inc. (“P2” or the “Company”) (TSXV: PGLD) (OTCQB: PGLDF) reports the completion of the April 2024 Updated Mineral Resource Estimate (“2024 MRE”) for its wholly-owned Gabbs Project located on the Walker-Lane Trend in Nevada. The 2024 MRE was prepared by...

read more

APPLIED GRAPHITE COMMENCES TRADING ON THE OTCQB

Apr 29, 2024

VANCOUVER, BC, April 29, 2024 /CNW/ – Applied Graphite Technologies Corporation (TSXV: AGT) (OTCQB: AGRTF) is pleased to announce that it has successfully completed the cross-listing of its common shares to the OTCQB Venture Market (“OTCQB“). AGT’s common shares are now trading on the OTCQB under the ticker symbol “AGRTF”. Investors can find real-time quotes and market information for AGRTF on www.otcmarkets.com. Applied Graphite Technologies continues to...

read more

Century Lithium Announces Positive Feasibility Study For The Clayton Valley Lithium Project, Nevada

Apr 29, 2024

FEASIBILITY STUDY HIGHLIGHTS Large-Scale Nevada-based Lithium Project: three-phase production plan will generate a life-of-mine average of 34,000 tonnes per annum (tpa) of battery-quality lithium carbonate (Li2CO3) Innovative Approach in Processing: patent-pending chloride leaching process combined with Direct Lithium Extraction (DLE), the Feasibility Study is supported by 2+ years of testing at the Company’s Pilot Plant Mineral Resource Estimate: Measured and Indicated resources totaling...

read more

Granada Gold Mine Advances Plans for On-Site Mill, Bolstering Economics and Grade Control

Apr 29, 2024

Rouyn Noranda, Q.C., April 29, 2024 – Granada Gold Mine Inc. (TSXV: GGM) (OTC: GBBFF) (Frankfurt: B6D) (the “Company” or “Granada”) is following up on the recent announcement regarding the development of a high-grade flow sheet. Granada Gold Mine is pleased to provide further details on its plans to establish a mill at the Granada property. After productive discussions with our preferred vendor, the company is moving forward with a comprehensive study to build a mill on site at...

read more

Gold Forecast: The Bull Run in Gold Miners is Just Starting

Apr 28, 2024

https://www.gold-eagle.com/article/gold-forecast-bull-run-gold-miners-just-starting By AG Thorson Technical Analysis Expert & Editor @ GoldPredict.com April 26, 2024 After years of going nowhere, gold launched into the next stage of its bull market. While inexperienced investors might feel inclined to capitalize on recent profits, such a move could prove detrimental in the long run. Gold and silver miners have underperformed the metals for years – recent evidence suggests that...

read more

ORIGINAL: Argentina Lithium positive Lithium Values in 12th Exploration well at Rincon West

Apr 26, 2024

2024-04-26 10:30 ET – News Release   (via NewsDirect) Argentina Lithium Vice President of Exploration Miles Rideout joined Steve Darling from Proactive to share positive results from the 12th exploration hole at the Rincon West Project in Salta Province, Argentina. Brine samples collected over a 165-meter interval of RW-DDH-012 ranged from 322 to 371 mg/l lithium. The Rincon West Project covers 5,198.8 hectares of the salar basin, consisting of three property blocks adjacent to Rio...

read more

Benchmark Minerals: Mining mega offer puts copper in spotlight

Apr 26, 2024

ACTIONABLE INTELLIGENCE FOR THE ENERGY STORAGE REVOLUTION Happy Friday! This week on Benchmark Source:  Copper drove BHP’s rejected $38.8 billion takeover bid for Anglo American this week, showing growing miner interest in acquisitions as prices for the metal surge and the supply gap widens.  Benchmark’s Copper Forecast service will launch in the second half of 2024, unravelling connections between...

read more

Globex: More Assay Results at Mirage (Lac Escale) Lithium Property

Apr 26, 2024

2024-04-25 More Assay Results at Mirage (Lac Escale) Lithium Property https://www.globexmining.com/

read more